The dry mix and wet mix processes are two fundamental techniques in residential and commercial shotcrete applications, each with distinct characteristics and advantages. Understanding their differences is crucial for selecting the appropriate method for a given construction project.

Below are some key differences between the dry mix and wet mix shotcrete processes.

Dry Mix Shotcrete (Gunite)

Process: In the dry mix process, the dry ingredients of concrete (cement, sand, and aggregate) are mixed and then fed into a shotcrete gun or hopper. Water is added to the dry mix at the nozzle just before spraying.

Control Over Mix: The operator has significant control over the water-to-cement ratio, as water is added at the last moment. This allows for adjustments in real-time based on the requirements of the application.

Rebound and Waste: Dry mix typically has a higher rate of rebound (material that bounces back from the surface), which can lead to more waste and higher supply costs.

Uses: It’s often used for smaller repair projects or in situations where the precise control of the mixture is crucial. It’s also preferred in areas where supplying water is challenging.

Equipment and Setup: The equipment for dry mix is usually simpler and more mobile, making it easier to set up and move around a job site.

Wet Mix Shotcrete

Process: In the wet mix process, all components of concrete, including water, are pre-mixed before being fed into the shotcrete machine. The fully mixed concrete is then pumped through a hose and sprayed out of the nozzle.

Consistent Quality: Since the mix is prepared beforehand, it offers more consistency in the water-to-cement ratio and overall mix quality.

Rebound and Waste: Wet mix shotcrete generally has a lower rebound rate compared to dry mix, resulting in less waste.

Uses: This method is ideal for larger scale projects due to its efficiency and the ability to spray more material in a shorter time. It’s commonly used in construction projects like tunnels, swimming pools, and large structural repairs.

Equipment and Setup: Wet mix requires more complex equipment, including a concrete mixer and pump, which can make the setup and cleanup processes more involved.